Excellent documents, download and read at ease Division of Construction Engineering Branches, Subitems and Inspection Batch Serial numb er 1 Excellent Documents of Division Engineering , Overvalue Download land base And base Foundation Subdivisiona l Engineering Unsupported earthwork Concrete Foundation Sub project earth excavation Earthwork backfill Formwork, Reinforcemen t, Concrete Earthwork excavation engineering Earthwork backfill project templates installing Template removal Steel processing Reinforcement connection Steel bar installation Inspection lot Form to be filled in for each inspection approval Each process is one inspection batch. It is divided into two inspection batches. Record sheet of quality acceptance for inspection batch of earthwork excavation engineering Record Form of Quality Acceptance for Inspection Batch of Earthwork Backfilling Project Each working procedure is a inspection batch, frame columns, beams, slabs and shear walls are a inspection batch, and the Quality Acceptance Record of Inspection Batch for Template Installation Project Quality Acceptance Record of Inspection Batch for Formwork Demolition Project Quality Acceptance Record Form for Inspection Batch of concrete construction Appearance quality of cast-inplace Size deviation of cast-in-place structure Masonry foundation Serial number 2 Main body structure Divisional Engineering concrete structure Brick masonry Brick Masonry Engineering Subdivisional Engineering Sub project Formwork, Reinforcemen t, Concrete templates installing Template removal Steel processing Reinforcement connection inspection batchesReinforcement Processing are dividedEngineering according to theQuality Acceptance Record Form concrete labelfor Inspection Batch of which needs to beReinforcement Installation Project poured separately. Quality Acceptance Record Form for Design and Inspection Batch of Concrete Raw Materials and Mixture Ratio Two inspection batches in one inspection batch Inspection lot Each floor of frame columns, beams and slabs is a inspection batch, and the concrete labels which need to be poured separately are divided into two inspection Record of Quality Acceptance of Inspection Batch for Filled Wall Masonry Project Form to be filled in for each inspection approval Quality Acceptance Record of Inspection Batch for Template Installation Project Quality Acceptance Record of Inspection Batch for Formwork Demolition Project Quality Acceptance Record Form for Inspection Batch of Steel bar installation concrete construction Appearance quality of castin-place structure batches. The structuralReinforcement Processing columns and the beamsEngineering Size deviation of doors and windowsQuality Acceptance Record Form for are divided into oneInspection Batch of Reinforcement of cast-ininspection batchInstallation Project place according to the floor. Quality Acceptance Record Form for structure Design and Inspection Batch of Concrete Raw Materials and Mixture masonry structure 3 Architectur e decorate Renovation Aerated block masonry Each floor is a inspection batch, and the number of inspection batches is divided by the number of each floor. Record of Quality Acceptance of Inspection Batch for Filled Wall Masonry Project Cement concrete base Leveling layer: Each floor is a inspection batch. (The number of inspection batches is divided by the number of layers per building) Quality Acceptance Record of Leveling Layer Inspection Batch Record form of quality acceptance for inspection batch of decorative brick surface Quality Acceptance Record of Inspection Batch for Brick Layer Infill wall Masonry ground Base, surface, movable floor surface Plaster General plastering Antiskid tiles High Metal Antistatic Flooring General plastering doors and windows Installation of wooden doors and windows, metal doors and windows, special doors Decorative plastering Inside wall plastering: one inspection batch for each floor (The number of inspection batches is divided by the number of layers per building) Exterior wall plastering: one inspection batch for one or two floors and one inspection batch for every three floors above Record form of quality acceptance for inspection batches of plastering engineering Installation of metal doors and windows The portal is divided into three inspection batches according to the unit, and the indoor doors and windows are divided into one inspection batch according to the differen
Division of Construction Engineering Branches Subitems and Inspection Batch
Tips: Current document can only be previewed at most page8,If the total number of pages in the document exceeds page 8,please download the document。
Uploaded by admin on 2019-10-15 15:16:58